✔ Communication Protocol

What is IEC 61850? The modern standard for substation automation

IEC 61850 is a standard developed for substation automation. It is not just a communication protocol; it is also a data model and an engineering method.

It defines communication between protection relays (IEDs), bay controllers and the station SCADA, and has become the de facto standard in modern substations.

Highlights

  • MMS (TCP 102)
  • GOOSE
  • Sampled Values
  • SCL files
  • PRP / HSR redundancy

How does it work?

IEC 61850 has three main forms of communication:

  • MMS: Used between SCADA and relays for monitoring, reporting and control.
  • GOOSE: Sends very fast signals (trips, interlocks) between relays. Signals that used to travel over wires now go over the network.
  • Sampled Values: Carries current and voltage samples digitally (in digital substations).

Device and station configurations are exchanged as XML files called SCL (ICD, SCD, CID), so engineering tools from different vendors can use the same information.

Hardware architecture

Protection Relays / IEDsbay levelIEC 61850 Switchesstation networkStation SCADA / HMIMMS clientGateway104 to the centreGPS / PTP Clocktime
  • IEDs: Protection relays and bay controllers.
  • Switches: Industrial switches certified for substation environments (IEC 61850-3).
  • Redundancy: With PRP or HSR, there is no interruption even if a cable or switch fails.
  • Time: A GPS clock with SNTP or the precision time protocol (PTP) keeps all devices on the same time.
  • Gateway: Usually sends station data to the remote centre via IEC 104.
  • Merging unit: In digital substations, converts current and voltage transformer values to digital.

Cable and material selection

  • Fibre optic: The standard choice between cells, bays and buildings. It is immune to the noise and potential differences created by high voltage, and safe for critical signals such as GOOSE.
  • Inside panels: Shielded Cat6 can be used over short distances.
  • Connectors and patch panels: LC fibre connectors and clearly labelled patch panels make maintenance easier.
  • Network design: Separate GOOSE traffic with VLANs and configure switches to prioritise it.
  • Power: Choose switches and gateways that run on the substation DC supply (e.g. 110 V DC).

Advantages and disadvantages

Advantages

  • Vendor-independent standard data model
  • Fast network signals with GOOSE instead of copper wiring
  • Consistent engineering data with SCL files
  • Redundant network (PRP/HSR)
  • Less cabling and easier expansion

Disadvantages

  • Long learning time
  • Engineering software and test equipment are costly
  • Network design needs care
  • Edition differences (Edition 1/2) between vendors can cause issues

IEC 61850 compared with similar protocols

IEC 61850IEC 104Modbus TCP
Where it is usedInside the substationBetween centre and siteField devices
Data modelRich, standard namesNumbered addresses (IOA)Numbered registers
Fast relay-to-relay signalsYes (GOOSE)NoNo
EngineeringSCL filesSignal listRegister map
DifficultyHighMediumLow

A common setup in practice: IEC 61850 inside the substation, and IEC 104 through a gateway to the centre and load dispatch.

How to test it

  1. Get the IED's ICD/CID file; check its IP address and logical device names.
  2. Connect with an MMS client, browse the data model and read measurements and status values.
  3. Confirm that reports (report control blocks) are enabled and changes arrive.
  4. Check GOOSE messages with a network monitoring tool or test set.

Testing with ATLAS SCADA

You can test the signals passed to IEC 104 through the station gateway with ATLAS SCADA, and verify breaker states, measurements and events on the SCADA screen.

Let's review your project together

Let's work out together which architecture, hardware and cabling fit your facility.

Let's talk about your project